|
|
Registros recuperados : 243 | |
Registros recuperados : 243 | |
|
|
| Acesso ao texto completo restrito à biblioteca da Embrapa Milho e Sorgo. Para informações adicionais entre em contato com cnpms.biblioteca@embrapa.br. |
Registro Completo
Biblioteca(s): |
Embrapa Milho e Sorgo. |
Data corrente: |
20/12/2004 |
Data da última atualização: |
30/05/2018 |
Tipo da produção científica: |
Artigo em Periódico Indexado |
Autoria: |
BRITO, R. A. L.; BASTINGS, I. W. A.; BORTOLOZZO, A. R. |
Afiliação: |
EMBRAPA-CNPMS. |
Título: |
The Paracatu/Entre Ribeiros irrigation scheme in Southeastern Brazil features and challenges in performance assessment |
Ano de publicação: |
2003 |
Fonte/Imprenta: |
Irrigation and Drainage Systems, v. 17, n. 4, p. 285-303, 2003. |
Idioma: |
Inglês |
Conteúdo: |
A case study is presented on the irrigation performance assessment of the Paracatul/Entre-Ribeiros project, a privately owned/managed center-pivot irrigation scheme in South-eastern Brazil. Seven indicators were chosen (delivery perfonnance, overall consumptive ratio, sustainability of irrigated area, power and energy consumption. operation and maintenance fraction, unit gross economic return. and global revenue/cost ratio) to assess the performance of the scheme in the period from 1997 through 2000. The values obtained for these indicators seem to have adequately expressed the current situation of the scheme by identifying low values of overall consumptive ratio. an indication of the need for improvement in the water management strategies of individual farmers. |
Palavras-Chave: |
Assessment; Performance indicators. |
Thesagro: |
Irrigação. |
Thesaurus NAL: |
irrigation. |
Categoria do assunto: |
X Pesquisa, Tecnologia e Engenharia |
Marc: |
LEADER 01392naa a2200193 a 4500 001 1483407 005 2018-05-30 008 2003 bl uuuu u00u1 u #d 100 1 $aBRITO, R. A. L. 245 $aThe Paracatu/Entre Ribeiros irrigation scheme in Southeastern Brazil features and challenges in performance assessment$h[electronic resource] 260 $c2003 520 $aA case study is presented on the irrigation performance assessment of the Paracatul/Entre-Ribeiros project, a privately owned/managed center-pivot irrigation scheme in South-eastern Brazil. Seven indicators were chosen (delivery perfonnance, overall consumptive ratio, sustainability of irrigated area, power and energy consumption. operation and maintenance fraction, unit gross economic return. and global revenue/cost ratio) to assess the performance of the scheme in the period from 1997 through 2000. The values obtained for these indicators seem to have adequately expressed the current situation of the scheme by identifying low values of overall consumptive ratio. an indication of the need for improvement in the water management strategies of individual farmers. 650 $airrigation 650 $aIrrigação 653 $aAssessment 653 $aPerformance indicators 700 1 $aBASTINGS, I. W. A. 700 1 $aBORTOLOZZO, A. R. 773 $tIrrigation and Drainage Systems$gv. 17, n. 4, p. 285-303, 2003.
Download
Esconder MarcMostrar Marc Completo |
Registro original: |
Embrapa Milho e Sorgo (CNPMS) |
|
Biblioteca |
ID |
Origem |
Tipo/Formato |
Classificação |
Cutter |
Registro |
Volume |
Status |
Fechar
|
Nenhum registro encontrado para a expressão de busca informada. |
|
|